6504 South U.S. Highway 421, Westville, IN 46391
P: 219-286-7639    Email

ABOUT THE FACILITY

Opened in 2013 and centrally located within miles of three major highways, the facility includes 40,000 square feet of under roof, concreted warehouse space, 15,000 square feet of which is heated. Two rail spurs located on the property will provide flexibility to our clients to store or transload components needed for upcoming or delayed projects where space may be limited. This facility now serves as a hub to provide specialized heavy lift and transport services in the Midwest.

Directions

Projects

caustic tower lift

Caustic & PreFrac Tower Lift

View Project
Caustic & PreFrac Tower Lift

Deep South Crane and Rigging was recently contracted by a southeast petrochemical plant as part of a major pre-turnaround project. In order to de-bottleneck ethylene production, Deep South erected a caustic tower and a prefrac tower.

Deep South Cranes

400,400 Pound Boiler Lifts

View Project
400,400 Pound Boiler Lifts

Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system and then trans-loaded onto Scheuerle SPMTs in a very congested unit.

Heavy Lift Crane in Tight Spaces

Overcoming Limited Space with Specialty Tools

View Project
Overcoming Limited Space with Specialty Tools

In the Midwest, Deep South transported and set a tower weighing 227,000 pounds and measuring 134’ long by 8’-2" in diameter.

A successful job is built on precise planning and safe execution. request a quote