100 Airpark Drive, DeQuincy, LA 70633
P: 337-508-3700    Email

ABOUT THE FACILITY

The Dequincy office was opened in 2014 as a transportation headquarter and state-of-the-art fabrication facility. The facility contains cutting edge fabrication technology including a robotic welding machine.

Directions

Projects

Heavy lift tail crane

Tailing Over a Live Pipe Rack Emphasizes Complex Project copy

View Project
Tailing Over a Live Pipe Rack Emphasizes Complex Project copy

From a tricky bridge crossing to a complex coordinated lift, Deep South facilitated the delivery and setting of components for a petrochemical facility acid modification and upgrade project in Louisiana. The key components included a 627,000-pound acid settler, 689,000-pound first stage reactor, acid storage drums and associated parts.

Act 100 Magazine Cover

A Marathon Job, Literally

View Project
A Marathon Job, Literally

As seen in American Cranes and Transport Magazine

Transforming a 200-acre sugarcane field in Garyville, LA into a state-of-the-art refinery required a $3.8 billion investment and the work of a cadre of contractors with expertise that spanned the entire spectrum of engineering, construction, and rigging. Construction on the Marathon GME project started in March of 2007, and by December of 2009 the refinery was mechanically complete.

Tugboat Transport Services

Scheuerles Haul 750 Ton Tugboat

View Project
Scheuerles Haul 750 Ton Tugboat

Deep South was contracted to transport a 750-ton tugboat.

A successful job is built on precise planning and safe execution. request a quote