ABOUT THE FACILITY

The Dequincy office was opened in 2014 as a transportation headquarter and state-of-the-art fabrication facility. The facility contains cutting edge fabrication technology including a robotic welding machine.

Directions

Projects

reactor lift and transport

Extreme Circumstances Call for Extreme Measures: A Narrow Canal Requires a Side Roll-Off

View Project
Extreme Circumstances Call for Extreme Measures: A Narrow Canal Requires a Side Roll-Off

Deep South was contracted to deliver a 750,000-pound reactor to a refinery in northern Illinois.  The navigable waterway, a highly-trafficked 125-foot wide canal, required a side roll-off.

caustic tower lift

Caustic & PreFrac Tower Lift

View Project
Caustic & PreFrac Tower Lift

Deep South Crane and Rigging was recently contracted by a southeast petrochemical plant as part of a major pre-turnaround project.  In order to de-bottleneck ethylene production, Deep South erected a caustic tower and a prefrac tower.

Heavy Lift Crane in Tight Spaces

Overcoming Limited Space with Specialty Tools

View Project
Overcoming Limited Space with Specialty Tools

In the Midwest, Deep South transported and set a tower weighing 227,000 pounds and measuring 134’ long by 8’-2" in diameter.

A successful job is built on precise planning and safe execution. request a quote