Projects
A High-pressure Exchange
View Project
A High-pressure Exchange
Assembling the 1,500T VersaCrane™ TC-24000 off site and moving it via SPMT saved this client 15 days of downtime and allowed the refinery unit to run at full capacity until unit shutdown. During the scheduled outage, Deep South was tasked to replace two coke drums, each weighed 452,800 lbs and were 19’-2” outside diameter and 96’-0” long and were comparable in size and weight to the old drums.
Maneuvering in Tight Spaces
View Project
Maneuvering in Tight Spaces
A seemingly routine lift and set of a pump house from the dock onto a barge came to a halt when a client’s crane failed—significantly impacting a task with a tight delivery window.
Fast Response to a Custom Turnaround
View Project
Fast Response to a Custom Turnaround
When an essential industrial unit targeted for replacement began to fail earlier than expected, a plant operator called on Deep South to help transport and replace key components to support an emergency turnaround.