Projects
Versatility in the Face of Constraints
View Project
Versatility in the Face of Constraints
In the Southwest, a depenthanizer vessel unexpectedly failed and needed immediate removal and replacement at a petrochemical facility.
Complex Boiler Maneuver
View Project
Complex Boiler Maneuver
Deep South was tasked with transporting, lifting, and installing a 350,000-pound boiler at a petrochemical plant in the Southwest.
Two Vessels, 750 Miles, One Turnkey Solution
View Project
Two Vessels, 750 Miles, One Turnkey Solution
Deep South was tasked by the fabricator to transport and stage two identical vessels, each measuring 120’ long, 13’ in diameter, and weighing 442 kips.