6135 Highway 347, Beaumont, TX 77705
P: 409-842-9280   F: 409-842-0729    Email

ABOUT THE FACILITY

Established in 2003, this full-service office is centrally located in the heart of the golden triangle to provide world-class crane and transport services.

Directions

Projects

Act 100 Magazine Cover

A Marathon Job, Literally

View Project
A Marathon Job, Literally

As seen in American Cranes and Transport Magazine

Transforming a 200-acre sugarcane field in Garyville, LA into a state-of-the-art refinery required a $3.8 billion investment and the work of a cadre of contractors with expertise that spanned the entire spectrum of engineering, construction, and rigging. Construction on the Marathon GME project started in March of 2007, and by December of 2009 the refinery was mechanically complete.

Coker Unit Lift Services

4 Drum Coker Unit

View Project
4 Drum Coker Unit

Deep South was contracted to complete a full replacement of a four-drum coker unit.

Heavy Transport Project over Steep Bridge

Making the Grade - A Steep Bridge Requires Deep South to Power Up

View Project
Making the Grade - A Steep Bridge Requires Deep South to Power Up

Deep South loaded, secured, and transported four pressure vessels from a fabrication shop to a petrochemical facility using a combination of Scheuerle SPMTs, a 500-ton hydraulic gantry, and Goldhofer Dual Lane trailers.

A successful job is built on precise planning and safe execution. request a quote