OTR Trailers and Tight Quarter Cranes Key to Successful Project
The upper and lower sections of this vessel, weighing 85T and 102T, respectively, were transported from the port to the refinery using over-the-road Dual Lane Goldhofers. They were then lifted and set, in combination with their supporting structures, using the 660-ton Demag CC2800-1 and the 500-ton Liebherr LTM1400 7.1.
-
Equipment Used
-
Services Used
-
By the Numbers
- Weighed 85T and 102T
Related Projects
A Technical Towering Roll, Move, and Lift
View Project
A Technical Towering Roll, Move, and Lift
As part of a complex project for a refinery, the Deep South team was tasked with receiving, transporting and lifting a 114’-7” x 33’-5” x 39’-10” vacuum tower weighing in excess of one million pounds. This multi-step project required considerable planning, technology and creative thinking.
250T Offshore Ship Lift in the Southwest
View Project
250T Offshore Ship Lift in the Southwest
Using a Terex Demag CC-2800, Deep South moved this offshore ship’s crane pieces into place.
200 Lifts at Michigan Power Plant
View Project
200 Lifts at Michigan Power Plant
At a Michigan power plant, Deep South utilized a 660-ton Demag CC-2800 to complete 200 lifts over an 8 month duration.