250T Offshore Ship Lift in the Southwest
Using a Terex Demag CC-2800, Deep South moved this offshore ship’s crane pieces into place. Pictured here: With rigging included, the total lift weight was 250T.
-
Equipment Used
-
Services Used
-
By the Numbers
- 250T lift total weight
Related Projects
Multi-Module Mission
View Project
Multi-Module Mission
The heavy haul transport of oil and gas refinery components is always a challenge. Transporting 17 modules, all in the span of two weeks, raised the bar. The modules varied greatly in size and weight. Two of the modules exceeded 260,000 lbs., while 11 were more than 16’ high, three were more than 19’ high, and 13 had widths greater than 18’. Initially, the customer had trouble finding a company to move the modules to their site in Texas.
A Technical Towering Roll, Move, and Lift
View Project
A Technical Towering Roll, Move, and Lift
As part of a complex project for a refinery, the Deep South team was tasked with receiving, transporting and lifting a 114’-7” x 33’-5” x 39’-10” vacuum tower weighing in excess of one million pounds. This multi-step project required considerable planning, technology and creative thinking.
Extreme Circumstances Call for Extreme Measures: A Narrow Canal Requires a Side Roll-Off
View Project
Extreme Circumstances Call for Extreme Measures: A Narrow Canal Requires a Side Roll-Off
Deep South was contracted to deliver a 750,000-pound reactor to a refinery in northern Illinois. The navigable waterway, a highly-trafficked 125-foot wide canal, required a side roll-off.