Overcoming Limited Space with Specialty Tools

In the Midwest, Deep South transported and set a tower weighing 227,000 pounds and measuring 134’ long by 8’-2" in diameter. Taking into consideration very low pipe racks along the route, Deep South used Goldhofer E-series SPMTs and flat bolsters to move under the pipe racks with 1.5” clearance. Limited space within the refinery required transporters to travel at a 90-degree angle from the original direction of travel. To set the vessel, Deep South used a 660-ton Demag CC2800-1, which was built over pipe racks in a confined area using our 500-ton gantry system.

  • Equipment Used

    • Goldhofer, E Series (SPMT) & THP Series
    • Hydraulic Gantries
    • Terex-Demag CC-2800-1
  • Services Used

  • By the Numbers

    • 227,000 Pounds
    • Measured 134' Long by 8'2" in Diameter
    • 1.5" Pipe Rack Clearance
Heavy Lift Crane in Tight Spaces

Related Projects

Chemical Reactor Transport

124-line SPMT Chemical Reactor Transport

View Project
124-line SPMT Chemical Reactor Transport

In the Southwest, Deep South received three vessels from a heavy lift ship at the Port of Houston, barged the vessels, and transported them to final staging using a total of 124-axle lines Scheuerle SPMT. The heaviest vessel weighed 1,800,000 pounds and the total gross weight at transport for that vessel was 2,300,000 pounds.

Pressure Valve Transportation Service

Barging Through: Delivering Over 300 Tons of Vessels

View Project
Barging Through: Delivering Over 300 Tons of Vessels

Deep South was contracted to barge and transport cold boxes, pressure vessels, and bullet tanks weighing in at nearly 400 tons.

Deep South Cranes

400,400 Pound Boiler Lifts

View Project
400,400 Pound Boiler Lifts

Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system and then trans-loaded onto Scheuerle SPMTs in a very congested unit.