400,400 Pound Boiler Lifts
Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system that was setup outside of the plant. The boilers were lifted and trans-loaded onto 12-line double-wide Scheuerle SPMTs and transported into the Southwest petrochemical refinery through a very congested unit.
Deep South then set them onto their foundations using two 500-ton Liebherr LTM 1400-7.1s and a 265-ton Liebherr LTM 1220-5.1. Each boiler weighed 400,400 pounds and was 52’ long, 13’ wide, and 26’ high.
-
Equipment Used
-
Services Used
-
By the Numbers
- 3 Boilers weighing 400,400 lbs
- Measuring 52’ x 13’ x 26’
Related Projects
Turnaround Efficiency: Lift, Lower and Slide
View Project
Turnaround Efficiency: Lift, Lower and Slide
A major process unit turnaround (TAR) project for a petrochemical plant in the Southwest required some well-planned logistics, over 1,200 craftworkers (at peak) and a comprehensive fleet of cranes, trucks and customized skid (Jack & Slide) systems.
15 Module Lift and Transport
View Project
15 Module Lift and Transport
Deep South was contracted by a Gulf Coast refinery to transport fifteen modules from a fabrication shop in Port Allen, LA to the site in Norco, LA.
Texas Tourist Bureau Installation
View Project
Texas Tourist Bureau Installation
Highlighting Deep South’s capability to provide services for small commercial projects, Deep South removed and installed an air conditioner at the Texas Tourist Bureau in Orange, Texas.