300T Offshore Living Quarters Lift
This living quarters module was installed onto an offshore support ship using the Terex Demag CC-2800 at a 72’ radius. The total lift weight was 300T.
-
Equipment Used
-
Services Used
-
By the Numbers
- 300T Lift
Related Projects
Complex Refinery Turnaround Delivered with Precision
View Project
Complex Refinery Turnaround Delivered with Precision
A five-week equipment turnaround at a refinery in the Southeast required multiple equipment transports, removals, and replacements across a large work area.
A High Lift for Health
View Project
A High Lift for Health
As part of an HVAC system upgrade, a client needed to place a new industrial-size, 25,000-pound chiller onto the roof of its multi-story medical facility in New Orleans, LA. The challenges on this project, located in a congested urban environment, ranged from limited space to set up cranes and associated support equipment to a requirement that trees along the roadway could not to be disturbed. Also, the road and medical facility had to remain open throughout the effort.
A Marathon Job, Literally
View Project
A Marathon Job, Literally
As seen in American Cranes and Transport Magazine
Transforming a 200-acre sugarcane field in Garyville, LA into a state-of-the-art refinery required a $3.8 billion investment and the work of a cadre of contractors with expertise that spanned the entire spectrum of engineering, construction, and rigging. Construction on the Marathon GME project started in March of 2007, and by December of 2009 the refinery was mechanically complete.