200 Lifts at Michigan Power Plant
At a Michigan power plant, Deep South utilized a 660-ton Demag CC-2800 (pictured here) to complete 200 lifts over an 8 month duration. This included multiple bag-house modules and duct sections, weighing up to 85 tons and measuring up to 85 feet in length. In addition, the 160-ton Tadano GR-1600XL-2 was used in the early phase of the project for erecting steel. Extreme temperatures brought 100 inches of snow during this time.
-
Equipment Used
-
Services Used
-
By the Numbers
- 200 Lifts
- Weighing up to 85 Tons
- Measuring up to 85' in Length
- 100" of Snow
Related Projects
Transporters and Cranes Facilitate Processing Plant Upgrade
View Project
Transporters and Cranes Facilitate Processing Plant Upgrade
The movement and replacement of process plant components are a familiar site in in the Texas Gulf Coast region—though not often to the scale and timeline faced by one EPC contractor. Per the client, the contractor was tasked with the haul and lift of two trains of fractionation tower components (debutanizer, depropanizer, splitter and deethanizer) over the course of nine months.
Managing the Weight of Expectations with Self-Deploying Bridge System
View Project
Managing the Weight of Expectations with Self-Deploying Bridge System
Transporting a 225,000-pound transformer over a bridge with a 30-ton weight limit would typically require the support of multiple assist cranes. With time and space constraints, a Louisiana-based heavy haul company teamed with Deep South to come up with alternative transport possibilities to manage the weight-limited bridge.
OTR Trailers and Tight Quarter Cranes Key to Successful Project
View Project
OTR Trailers and Tight Quarter Cranes Key to Successful Project
The upper and lower sections of this vessel, weighing 85T and 102T, were transported from the port to the refinery using dual lane Goldhofers.