News


Expert Execution on a Time-Critical LNG Changeout

When a critical motor failed at an LNG plant, the clock started immediately. At 680,000 lbs, the motor had never been changed out before.

READ MORE


Stay Informed

Join our quarterly mailing list to keep up with the latest Deep South Crane & Rigging news.


15-Month Turnkey Transport and Erection Project at a Western Iowa Plant

Deep South was contracted to provide turnkey transportation and field erection services as part of a grassroots fertilizer project at a plant in Western Iowa. Over this 15-month period more than 150 pieces of plant equipment were successfully transported and erected.

READ MORE


Slow Ride: 330-Ton Reactor Makes Trek Through Riverbend to Refinery

The 90 foot-long, 24 foot-wide apparatus was secured to the platform of a self-propelled modular trailer and operated by Deep South Industrial Services to make the roughly five-hour trip from the Phoenix Terminal in Hartford to the refinery in Roxana.

READ MORE

Refinery Turnaround Requires All Hands On Deck

Refinery units undergoing a turnaround are taken apart – and components are inspected, repaired or replaced – before being put back together. Turnaround activity can either be confined to individual units or parts of a refinery at a time, or in the case of the recent Texas City turnaround, involve the entire plant.

READ MORE


Employee Spotlight: Kerry Hulse

Kerry Hulse, vice president of Deep South Crane & Rigging, has dedicated much of his career to improving safety for those in this unique and challenging line of business. His expertise and influence within the industry has allowed him to spearhead safety programs, resulting in the safety certification of over 100,000 crane operators.

READ MORE


Safety Source: Parking Lot Safety

It’s important to remain vigilant and aware of your surroundings. In even the most familiar or seemingly harmless area, the potential for danger and accidents can be anywhere. Parking lots, whether at your office, your favorite store, or outside of a stadium all offer the possibility of accidents. However with a few helpful tips and best practices, making your way to and from your car can be a safe and pleasant.

READ MORE


Flare Stack Lift

Deep South Crane and Rigging was contracted for a heavy lift project in Norco, Louisiana. The scope of work required for this lift included lifting two sections of a flare stack and the flare tip. To perform these three lifts totaling nearly 300’, Deep South used the 1,320-ton Demag AC-1000 and the 500-ton Liebherr LTM 1400-71, which served as the tail crane.

READ MORE

Caustic & Prefrac Tower Lift Project

Deep South Crane and Rigging was recently contracted by a southeast petrochemical plant as part of a major pre-turnaround project. In order to de-bottleneck ethylene production, Deep South erected a caustic tower and a prefrac tower. With dozens of different contractors and over 700 workers, a confined and congested work area posed the greatest challenge.

READ MORE

A successful job is built on precise planning and safe execution. request a quote