92-line Offshore Platform Specialty Transport
Using 92 lines of Deep South's heavy haul Scheuerle SPMTs with 3 power pack units, Deep South successfully assisted the client in moving this offshore platform in Texas. The offshore platform weighed approximately 1,990 tons and spanned 83’ long, 73’ wide, and 95’ tall.
-
Equipment Used
-
Services Used
-
By the Numbers
- Platform weighed 1,990T
- Measured 83' long x 73' wide x 95' tall
- Used 92 lines of SPMTs
Related Projects
A Technical Towering Roll, Move, and Lift
View Project
A Technical Towering Roll, Move, and Lift
As part of a complex project for a refinery, the Deep South team was tasked with receiving, transporting and lifting a 114’-7” x 33’-5” x 39’-10” vacuum tower weighing in excess of one million pounds. This multi-step project required considerable planning, technology and creative thinking.
Creative Thinking Keeps Transport Costs Low and Delivery Quick
View Project
Creative Thinking Keeps Transport Costs Low and Delivery Quick
As part of a natural gas fractionation project, an EPC contractor needed to transport two large drums to the customer’s facility.
300T Offshore Living Quarters Lift
View Project
300T Offshore Living Quarters Lift
This 300T living quarters module was installed onto an offshore support ship using the Terex Demag CC-2800.