Coal Export Facility System Upgrade
At a coal export terminal in Southeast Texas, Deep South provided multiple single and tandem lifts to install this conveyor system during a facility upgrade using the 265-ton Liebherr LTM 1220-5.2, the 400-ton Demag AC350/6, and the 1320-ton Terex AC-1000. Conveyor sections weighed 40,000 pounds to 132,000 pounds and measured up to 170’ in length.
-
Equipment Used
-
Services Used
-
By the Numbers
- Size 170’ in Length
- Weight 40,000-132,000 Pounds
Related Projects
Transporters and Cranes Facilitate Processing Plant Upgrade
View Project
Transporters and Cranes Facilitate Processing Plant Upgrade
The movement and replacement of process plant components are a familiar site in in the Texas Gulf Coast region—though not often to the scale and timeline faced by one EPC contractor. Per the client, the contractor was tasked with the haul and lift of two trains of fractionation tower components (debutanizer, depropanizer, splitter and deethanizer) over the course of nine months.
15 Module Lift and Transport
View Project
15 Module Lift and Transport
Deep South was contracted by a Gulf Coast refinery to transport fifteen modules from a fabrication shop in Port Allen, LA to the site in Norco, LA.
Industrial Airpark Lift
View Project
Industrial Airpark Lift
At an industrial airpark in Louisiana, Deep South set steel roof sections weighing 32,000 pounds and measuring 85' long by 30' wide each.