37 Vessel Heavy Haul
As part of an expansion project in the Southwest, Deep South received, barged, and transported 37 vessels to complete this project. Pictured here is the largest of those vessels, an 800-ton quench tower. Using Deep South’s 1,000-ton rocking bolsters, in-house designed transport saddles, and a 120’ bridge ramp, Deep South was able to negotiate the barge roll off and 4 miles of roadways through town to reach the job site. This included crossing three jumper bridges, the longest measuring 120’ in length.
-
Equipment Used
-
Services Used
-
By the Numbers
- 37 Vessels
- Largest was 800T, 120' Long
Related Projects
Reconfigured for a Higher Load
View Project
Reconfigured for a Higher Load
During a planned outage, a petrochemical facility in Texas needed to replace a large tower head—measuring 54' L x 30' W x 30' H and weighing 280,000 pounds. Deep South Crane & Rigging selected a strategic setup location for its 2,500-ton VersaCrane TC-36000 to accommodate both the head lift and additional turnaround work. The lift was initially planned at 350,000 pounds, accounting for tray installation.
15 Module Lift and Transport
View Project
15 Module Lift and Transport
Deep South was contracted by a Gulf Coast refinery to transport fifteen modules from a fabrication shop in Port Allen, LA to the site in Norco, LA.
37 Vessel Heavy Haul
View Project
37 Vessel Heavy Haul
As part of an expansion project in the Southwest, Deep South received, barged, and transported 37 vessels to complete this project.