37 Vessel Heavy Haul
As part of an expansion project in the Southwest, Deep South received, barged, and transported 37 vessels to complete this project. Pictured here is the largest of those vessels, an 800-ton quench tower. Using Deep South’s 1,000-ton rocking bolsters, in-house designed transport saddles, and a 120’ bridge ramp, Deep South was able to negotiate the barge roll off and 4 miles of roadways through town to reach the job site. This included crossing three jumper bridges, the longest measuring 120’ in length.
-
Equipment Used
-
Services Used
-
By the Numbers
- 37 Vessels
- Largest was 800T, 120' Long
Related Projects
Full Steam Ahead with New Boiler Transport
View Project
Full Steam Ahead with New Boiler Transport
The transport of a 350,000-pound “therm” steam boiler from fabricator to plant, a distance of 375 miles, required creativity and experience to safely move the component, despite some clearance limitations and unexpected construction along the way.
Southeast Petrochemical Turnaround
View Project
Southeast Petrochemical Turnaround
Supplying all cranes in two units during a petrochemical turnaround in the Southeast, Deep South supported the change out of old components and reinstallation of new components with 19 cranes working throughout the project.
Overcoming Limited Space with Specialty Tools
View Project
Overcoming Limited Space with Specialty Tools
In the Midwest, Deep South transported and set a tower weighing 227,000 pounds and measuring 134’ long by 8’-2" in diameter.