37 Vessel Heavy Haul
As part of an expansion project in the Southwest, Deep South received, barged, and transported 37 vessels to complete this project. Pictured here is the largest of those vessels, an 800-ton quench tower. Using Deep South’s 1,000-ton rocking bolsters, in-house designed transport saddles, and a 120’ bridge ramp, Deep South was able to negotiate the barge roll off and 4 miles of roadways through town to reach the job site. This included crossing three jumper bridges, the longest measuring 120’ in length.
-
Equipment Used
-
Services Used
-
By the Numbers
- 37 Vessels
- Largest was 800T, 120' Long
Related Projects
Seamless Reactor Haul & Lift Keeps Refinery Upgrade on Track
View Project
Seamless Reactor Haul & Lift Keeps Refinery Upgrade on Track
In St. Charles Parish, LA, Deep South Crane & Rigging completed a massive vessel transport and lift project in support of a major refinery upgrade.
15-Month Turnkey Transport and Erection Project at a Western Iowa Plant
View Project
15-Month Turnkey Transport and Erection Project at a Western Iowa Plant
Deep South was contracted to provide turnkey transportation and field erection services as part of a grassroots fertilizer project at a plant in Western Iowa. Over this 15-month period more than 150 pieces of plant equipment were successfully transported and erected.
Industrial Airpark Lift
View Project
Industrial Airpark Lift
At an industrial airpark in Louisiana, Deep South set steel roof sections weighing 32,000 pounds and measuring 85' long by 30' wide each.