Related Projects
Reconfigured for a Higher Load
View Project
Reconfigured for a Higher Load
During a planned outage, a petrochemical facility in Texas needed to replace a large tower head—measuring 54' L x 30' W x 30' H and weighing 280,000 pounds. Deep South Crane & Rigging selected a strategic setup location for its 2,500-ton VersaCrane TC-36000 to accommodate both the head lift and additional turnaround work. The lift was initially planned at 350,000 pounds, accounting for tray installation.
Turnaround Efficiency: Lift, Lower and Slide
View Project
Turnaround Efficiency: Lift, Lower and Slide
A major process unit turnaround (TAR) project for a petrochemical plant in the Southwest required some well-planned logistics, over 1,200 craftworkers (at peak) and a comprehensive fleet of cranes, trucks and customized skid (Jack & Slide) systems.
4 Drum Coker Unit
View Project
4 Drum Coker Unit
Deep South was contracted to complete a full replacement of a four-drum coker unit.