Related Projects
Turnaround Efficiency: Lift, Lower and Slide
View Project
Turnaround Efficiency: Lift, Lower and Slide
A major process unit turnaround (TAR) project for a petrochemical plant in the Southwest required some well-planned logistics, over 1,200 craftworkers (at peak) and a comprehensive fleet of cranes, trucks and customized skid (Jack & Slide) systems.
Overcoming Obstacles: 800-mile Turnkey Challenge with Notable Jack and Slide
View Project
Overcoming Obstacles: 800-mile Turnkey Challenge with Notable Jack and Slide
Using its nationwide resources, Deep South transported a reactor and third stage separator from Oklahoma to Ohio and then to its final destination in the refinery using a combination of barging, over-the-road transportation, jack and slide operations, and heavy lifting.
Precision Meets Power
View Project
Precision Meets Power
Replacing a 650-kip reactor head in the Southwest required Deep South’s team to fit a crane into a tight space where others had been unable to do so. The job involved precise execution to build a high-capacity crane over a pipe rack and into a confined space, which called for the assistance of our 800-ton gantry system, 500-ton Liebherr LTM 1400-7.1, and 265-ton Liebherr LTM 1220-5.1.