A High Pressure Exchange

Assembling the 1,500T VersaCrane™ TC-24000 off site and moving it via SPMT saved this client 15 days of downtime and allowed the refinery unit to run at full capacity until unit shutdown. During the scheduled outage, Deep South was tasked to replace two coke drums, each weighed 452,800 lbs and were 19’-2” outside diameter and 96’-0” long and were comparable in size and weight to the old drums.

READ MORE


Stay Informed

Join our quarterly mailing list to keep up with the latest Deep South Crane & Rigging news.


Pressed for Time

A vehicle manufacturer’s large stamping press—a massive machine used for shaping body panels—is online and operational thanks to efficient installation by Deep South. The three primary components included a 181-ton press bed (27.72’ L x 16.4’ W x 13.12’ H), 250-ton press crown (28.38’ L x 16.4’ W x 13.12’ H) and a 92-ton press slide (21’ x 10.83’ x 10.5’).

READ MORE


Multi-Module Mission

The heavy haul transport of oil and gas refinery components is always a challenge. Transporting 17 modules, all in the span of two weeks, raised the bar. The modules varied greatly in size and weight. Two of the modules exceeded 260,000 lbs., while 11 were more than 16’ high, three were more than 19’ high, and 13 had widths greater than 18’. Initially, the customer had trouble finding a company to move the modules to their site in Texas.

READ MORE

Saddle Up: Customized Solutions Place Refinery Column with Care

The Deep South team was tasked to receive, transport and set a 790,025-pound debutanizer. This specialized distillation column measures 174’-3” long with a 21’-3” diameter. The debutanizer was received from an ocean-going vessel at the Port of New Orleans. Once cleared through customs, the debutanizer was loaded on a barge and pushed to a roll-off site 8 hours upriver, and prepared for transport to the refinery.

READ MORE


2023 Safety Award Round Up

As we look back on 2023, Deep South is pleased to highlight the following recognitions awarded to our team:


READ MORE


Our Customers’ Purpose-Driven Partner

Deep South was started in 1968 with a passion for the heavy-lift and heavy-haul industry and a relentless drive to be the best of the best.

READ MORE


Safety Source : The Fire Tetrahedron

The captivating nature of fire has fascinated humanity for generations, and behind its beauty lies the scientific principle of the fire tetrahedron. The National Fire Protection Association (NFPA) is the leading authority on the fire tetrahedron and offers an in-depth explanation on its website. We've condensed the key insights from the NFPA about the fire tetrahedron for your reference.

READ MORE

Customized Heavy Lift Solution Safely Delivers Regenerator

Limited space, low ground bearing pressure and a cumbersome heat exchanger combined to create some unique challenges for the Deep South team in California. The customer needed to lift a 35’-diameter x 70’-long regenerator head with cyclones, weighing 775,000 pounds in a tight, geologically compromised area.

READ MORE