Industrial Airpark Lift
At an industrial airpark in Louisiana, Deep South set steel roof sections weighing 32,000 pounds and measuring 85' long by 30' wide each. Two 265-ton Liebherr LTM 1220-5.1s and a 60-ton Tadano GR-600XL-1 assisted in the build. Custom rigging was designed for the lifts to ensure level alignment.
-
Equipment Used
-
Services Used
-
By the Numbers
- Sections weighed 32,000 pounds
- Measured 85' long x 30' wide
Related Projects
Demag CC-2800 Completes Lock Hopper Changeout
View Project
Demag CC-2800 Completes Lock Hopper Changeout
Overlooking Lake Michigan, Deep South assisted in a steel mill lock hopper changeout using the 660-ton Demag CC-2800 with 138' of main boom and 157' of luffing jib with super lift attachment.
Amine Converter Replacement & Heater Stack Demolition
View Project
Amine Converter Replacement & Heater Stack Demolition
At a petrochemical refinery in the Southwest, the demolition of two heater stacks and the replacement of an amine converter tower presented significant logistical challenges.
Custom Solutions for a 3-Million-Pound Challenge
View Project
Custom Solutions for a 3-Million-Pound Challenge
Two massive reactors, each weighing nearly three million pounds and standing 143 feet 6 inches tall, journeyed from the Port of New Orleans up the Mississippi River to a refinery in the Southeast. From transportation to final placement, the project required customized solutions at every step to address the unique challenges of the route, site and massive loads.