Related Projects
Multi-Module Mission
View Project
Multi-Module Mission
The heavy haul transport of oil and gas refinery components is always a challenge. Transporting 17 modules, all in the span of two weeks, raised the bar. The modules varied greatly in size and weight. Two of the modules exceeded 260,000 lbs., while 11 were more than 16’ high, three were more than 19’ high, and 13 had widths greater than 18’. Initially, the customer had trouble finding a company to move the modules to their site in Texas.
Scheuerle Highway Trailers Key To Deep South Crane Heavy Haul
View Project
Scheuerle Highway Trailers Key To Deep South Crane Heavy Haul
Deep South Crane & Rigging hauled two manifold skids from Zachary, Louisiana to the Botsco Terminal in Laporte, Texas using Scheuerle highway trailers. This equipment allowed Deep South to expedite permitting to 1 week’s time.
A High-pressure Exchange
View Project
A High-pressure Exchange
Assembling the 1,500T VersaCrane™ TC-24000 off site and moving it via SPMT saved this client 15 days of downtime and allowed the refinery unit to run at full capacity until unit shutdown. During the scheduled outage, Deep South was tasked to replace two coke drums, each weighed 452,800 lbs and were 19’-2” outside diameter and 96’-0” long and were comparable in size and weight to the old drums.