Coker Derrick Structure Installation
Deep South hoisted and set the four sections of the coker derrick structure, the heaviest of which weighed 256 tons, and two 450-ton coke drums at a Midwest Refinery using our 2,500-ton VersaCrane TC-36000 and our 275-ton Demag CC-1400. Deep South made the first six lifts with 450’ of main boom in the 2,500-ton VersaCrane and then, due to the final elevation of the derrick, installed an additional 80’ of fixed jib to set the final section of the derrick structure. Deep South also provided all of the rigging systems required to complete this job.
-
Equipment Used
-
Services Used
-
By the Numbers
- 4 Sections of Coker Derrick, Heaviest 256T
- 2 Coke Drums at 450T
Related Projects
15 Module Lift and Transport
View Project
15 Module Lift and Transport
Deep South was contracted by a Gulf Coast refinery to transport fifteen modules from a fabrication shop in Port Allen, LA to the site in Norco, LA.
Overcoming Poor Weather Conditions in Michigan to Lift 12 Components
View Project
Overcoming Poor Weather Conditions in Michigan to Lift 12 Components
Deep South set the first of 12 components ranging from 85,000 pounds to 110,000 pounds using the 1,400-ton Demag CC-6800 at a mining facility in Michigan.
Lifting the Dome
View Project
Lifting the Dome
Using the 660-ton Demag CC-2800-1, Deep South successfully set this 244’ in diameter geodesic dome weighing approximately 145,000 pounds.