Throughout our nearly five decades of experience in heavy lift and transport solutions, we have learned that a successful job is built on precise planning and safe execution. This mindset has allowed our business to grow and positively impact some of the most complex projects across two continents. Take a look at what we can do.

A High-pressure Exchange

View Project
A High-pressure Exchange

Assembling the 1,500T VersaCrane™ TC-24000 off site and moving it via SPMT saved this client 15 days of downtime and allowed the refinery unit to run at full capacity until unit shutdown. During the scheduled outage, Deep South was tasked to replace two coke drums, each weighed 452,800 lbs and were 19’-2” outside diameter and 96’-0” long and were comparable in size and weight to the old drums.

Full Steam Ahead with New Boiler Transport

View Project
Full Steam Ahead with New Boiler Transport

The transport of a 350,000-pound “therm” steam boiler from fabricator to plant, a distance of 375 miles, required creativity and experience to safely move the component, despite some clearance limitations and unexpected construction along the way.

Pressed for Time

View Project
Pressed for Time

A vehicle manufacturer’s large stamping press—a massive machine used for shaping body panels—is online and operational thanks to efficient installation by Deep South. The three primary components included a 181-ton press bed (27.72’ L x 16.4’ W x 13.12’ H), 250-ton press crown (28.38’ L x 16.4’ W x 13.12’ H) and a 92-ton press slide (21’ x 10.83’ x 10.5’).

Saddle Up: Customized Solutions Place Refinery Column with Care

View Project
Saddle Up: Customized Solutions Place Refinery Column with Care

The Deep South team was tasked to receive, transport and set a 790,025-pound debutanizer. This specialized distillation column measures 174’-3” long with a 21’-3” diameter. The debutanizer was received from an ocean-going vessel at the Port of New Orleans. Once cleared through customs, the debutanizer was loaded on a barge and pushed to a roll-off site 8 hours upriver, and prepared for transport to the refinery.

Haul & Lift of Refinery Combination Tower Goes Off Without a Hitch

View Project
Haul & Lift of Refinery Combination Tower Goes Off Without a Hitch

Load, haul, roll and set — seemingly simple words unless associated with a 555,000-pound, 160-foot long, 18-foot wide, over 19-foot tall refinery combination tower.

Creative Thinking Keeps Transport Costs Low and Delivery Quick

View Project
Creative Thinking Keeps Transport Costs Low and Delivery Quick

As part of a natural gas fractionation project, an EPC contractor needed to transport two large drums to the customer’s facility.

Seamless Reactor Haul & Lift Keeps Refinery Upgrade on Track

View Project
Seamless Reactor Haul & Lift Keeps Refinery Upgrade on Track

In St. Charles Parish, LA, Deep South Crane & Rigging completed a massive vessel transport and lift project in support of a major refinery upgrade.

Go Small to Gain Big: Transport Optimized for Efficient Transport

View Project
Go Small to Gain Big: Transport Optimized for Efficient Transport

When an oil & gas customer needed help transporting a new oxygen tank from Texas to a gas facility in South Carolina, the options seemed costly and complex. Deep South’s logistics specialists took a custom approach to the transport of a 375,000-lb oxygen tank from road to rail to plant, saving time and money for the client.

Power Move: Transformer Lift and Staging Rises to the Occasion

View Project
Power Move: Transformer Lift and Staging Rises to the Occasion

In support of a power plant project in the Northeast, Deep South crews were tasked with transporting and staging four transformers, each 22’ high, 12’ wide and 14’ long and weighing 314,000 pounds.

heavy lift system

Combined Gantry/Strand Jack Systems Power Lifts Co-Gen Train

View Project
Combined Gantry/Strand Jack Systems Power Lifts Co-Gen Train

The construction of a combined-cycle power station in Louisiana required a specialty contractor to move, lift and set a STG generator (692,250 lbs.) and HIP turbine (392,420 lbs.).

Tight Tailswing, Turnkey Solution

View Project
Tight Tailswing, Turnkey Solution

In the Southeast, Deep South performed a complex turnkey project that required equipment modification and careful planning.

Deep South Cranes

400,400 Pound Boiler Lifts

View Project
400,400 Pound Boiler Lifts

Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system and then trans-loaded onto Scheuerle SPMTs in a very congested unit.

Heavy Lift Crane in Tight Spaces

Overcoming Limited Space with Specialty Tools

View Project
Overcoming Limited Space with Specialty Tools

In the Midwest, Deep South transported and set a tower weighing 227,000 pounds and measuring 134’ long by 8’-2" in diameter.

A successful job is built on precise planning and safe execution. request a quote