Texas Tourist Bureau Installation
Highlighting Deep South’s capability to provide services for small commercial projects, Deep South removed and installed an air conditioner at the Texas Tourist Bureau in Orange, Texas. Pictured here is the 235-ton Liebherr LTM1200-5.1.
-
Equipment Used
-
Services Used
Related Projects
New 3,000T VersaCrane TC-36000/S2 Makes Lifting Debut - AC&T Feature
View Project
New 3,000T VersaCrane TC-36000/S2 Makes Lifting Debut - AC&T Feature
For more than 50 years, Deep South Crane & Rigging has been distinguishing itself throughout North America. Founder Camile Landry has an intense appreciation for cranes, and he has always been intrigued by projects that require a higher level of skill and expertise. In the 1980s, he saw a need for a new generation of cranes. He envisioned a high-capacity crane with a smaller footprint and a tighter tail swing. He wanted to see a crane that could be transported easier than other heavy lift cranes.
Coal Export Facility System Upgrade
View Project
Coal Export Facility System Upgrade
At a coal export terminal in Southeast Texas, Deep South provided multiple single and tandem lifts to install this conveyor system during a facility upgrade.
Lifting the Dome
View Project
Lifting the Dome
Using the 660-ton Demag CC-2800-1, Deep South successfully set this 244’ in diameter geodesic dome weighing approximately 145,000 pounds.