OTR Trailers and Tight Quarter Cranes Key to Successful Project
The upper and lower sections of this vessel, weighing 85T and 102T, respectively, were transported from the port to the refinery using over-the-road Dual Lane Goldhofers. They were then lifted and set, in combination with their supporting structures, using the 660-ton Demag CC2800-1 and the 500-ton Liebherr LTM1400 7.1.
-
Equipment Used
-
Services Used
-
By the Numbers
- Weighed 85T and 102T
Related Projects
Pressed for Time
View Project
Pressed for Time
A vehicle manufacturer’s large stamping press—a massive machine used for shaping body panels—is online and operational thanks to efficient installation by Deep South. The three primary components included a 181-ton press bed (27.72’ L x 16.4’ W x 13.12’ H), 250-ton press crown (28.38’ L x 16.4’ W x 13.12’ H) and a 92-ton press slide (21’ x 10.83’ x 10.5’).
New Orleans Coffee Plant
View Project
New Orleans Coffee Plant
Deep South was contracted to lift and set the top 3 decks of a tugboat wheel house.
Mitigating the Mississippi
View Project
Mitigating the Mississippi
Pulling from its resources and years of experience, Deep South designed and fabricated a barge ramp in 2 weeks time meeting the new CORPS requirements and allowing the project to continue on schedule.