Coal Export Facility System Upgrade
At a coal export terminal in Southeast Texas, Deep South provided multiple single and tandem lifts to install this conveyor system during a facility upgrade using the 265-ton Liebherr LTM 1220-5.2, the 400-ton Demag AC350/6, and the 1320-ton Terex AC-1000. Conveyor sections weighed 40,000 pounds to 132,000 pounds and measured up to 170’ in length.
-
Equipment Used
-
Services Used
-
By the Numbers
- Size 170’ in Length
- Weight 40,000-132,000 Pounds
Related Projects
Specialty Ramps Save Client Money
View Project
Specialty Ramps Save Client Money
Our Demag CC-6800 set 4 vessels into final position, traveling with the full load on the hook and utilizing Deep South’s specialty ramps.
Blue Sea Modular Transport
View Project
Blue Sea Modular Transport
In South Carolina, Deep South was contracted to transport and secure seven modules from the fabricator shop to a barge site via Scheuerle SPMTs.
420T Vessel VersaCrane™ Lift
View Project
420T Vessel VersaCrane™ Lift
Using our powerful 2,500-ton VersaCrane TC-36000 with 450’ main boom and a 260’ radius, Deep South successfully removed and replaced these vessels, the largest of which was 420 tons.