Coal Export Facility System Upgrade
At a coal export terminal in Southeast Texas, Deep South provided multiple single and tandem lifts to install this conveyor system during a facility upgrade using the 265-ton Liebherr LTM 1220-5.2, the 400-ton Demag AC350/6, and the 1320-ton Terex AC-1000. Conveyor sections weighed 40,000 pounds to 132,000 pounds and measured up to 170’ in length.
-
Equipment Used
-
Services Used
-
By the Numbers
- Size 170’ in Length
- Weight 40,000-132,000 Pounds
Related Projects
Turnaround Efficiency: Lift, Lower and Slide
View Project
Turnaround Efficiency: Lift, Lower and Slide
A major process unit turnaround (TAR) project for a petrochemical plant in the Southwest required some well-planned logistics, over 1,200 craftworkers (at peak) and a comprehensive fleet of cranes, trucks and customized skid (Jack & Slide) systems.
Demag CC-2800 Completes Lock Hopper Changeout
View Project
Demag CC-2800 Completes Lock Hopper Changeout
Overlooking Lake Michigan, Deep South assisted in a steel mill lock hopper changeout using the 660-ton Demag CC-2800 with 138' of main boom and 157' of luffing jib with super lift attachment.
Mitigating the Mississippi
View Project
Mitigating the Mississippi
Pulling from its resources and years of experience, Deep South designed and fabricated a barge ramp in 2 weeks time meeting the new CORPS requirements and allowing the project to continue on schedule.