News


15 Module Lift and Transport

Deep South was contracted by a Gulf Coast refinery to transport fifteen modules from a fabrication shop in Port Allen, LA to the site in Norco, LA. Transport planning required an in-depth route survey and extensive coordination with state and local authorities and numerous third-party utilities. These modules (up to 20’-3” transport height) were delivered to the facility on Goldhofer THP/SL transporters and set using a 660-ton Terex CC2800-1 crawler crane.

CLICK HERE TO LEARN MORE ABOUT THIS PROJECT


Pressed for Time

A vehicle manufacturer’s large stamping press—a massive machine used for shaping body panels—is online and operational thanks to efficient installation by Deep South. The three primary components included a 181-ton press bed (27.72’ L x 16.4’ W x 13.12’ H), 250-ton press crown (28.38’ L x 16.4’ W x 13.12’ H) and a 92-ton press slide (21’ x 10.83’ x 10.5’).

READ MORE

Multi-Module Mission

The heavy haul transport of oil and gas refinery components is always a challenge. Transporting 17 modules, all in the span of two weeks, raised the bar. The modules varied greatly in size and weight. Two of the modules exceeded 260,000 lbs., while 11 were more than 16’ high, three were more than 19’ high, and 13 had widths greater than 18’. Initially, the customer had trouble finding a company to move the modules to their site in Texas.

READ MORE