Related Projects
Precarious Conditions on the Dock
View Project
Precarious Conditions on the Dock
Rail-traveling ship loaders are a familiar sight on the Gulf Coast (and around the world)—and they are essential to the efficient loading of bulk materials. Disruption to the operation of these massive machines directly affects productivity and the bottom line, as represented by one company's experience when wind from a severe storm knocked the machine off its rails, leaving it dangerously close to the edge of the dock.
A Pool of Possibilities
View Project
A Pool of Possibilities
As part of a high-rise renovation project, the owner needed a 23,333-pound swimming pool lifted onto the roof of a multi-use office and residential building in downtown Baton Rouge, Louisiana. The building height is 273.2’ with an upper deck that sits 277.4' above the ground that surrounds the pool.
Saddle Up: Customized Solutions Place Refinery Column with Care
View Project
Saddle Up: Customized Solutions Place Refinery Column with Care
The Deep South team was tasked to receive, transport and set a 790,025-pound debutanizer. This specialized distillation column measures 174’-3” long with a 21’-3” diameter. The debutanizer was received from an ocean-going vessel at the Port of New Orleans. Once cleared through customs, the debutanizer was loaded on a barge and pushed to a roll-off site 8 hours upriver, and prepared for transport to the refinery.