For a refinery in the Southeast, Deep South was contracted to remove and replace a derrick structure and two 491,000-pound vessels, each measuring 99’ long and 24’2” diameter.
Specialty Ramps Save Client Money
View Project
Specialty Ramps Save Client Money
Our Demag CC-6800 set 4 vessels into final position, traveling with the full load on the hook and utilizing Deep South’s specialty ramps.
Turnkey Demolition Facilitates Clean Refinery Modernization
View Project
Turnkey Demolition Facilitates Clean Refinery Modernization
In South America, Deep South demolished and removed three units within a petrochemical facility that was more than 50 years old.