Deep South has put its transport and skills to work for a heavy industrial project in the Southwest that required Deep South to direct discharge from ships gear to barge, haul and sett a cold box, depropanizer and six modules.
Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system and then trans-loaded onto Scheuerle SPMTs in a very congested unit.