In the Southeast, Deep South performed a complex turnkey project that required equipment modification and careful planning.
In South America, Deep South demolished and removed three units within a petrochemical facility that was more than 50 years old.
Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system and then trans-loaded onto Scheuerle SPMTs in a very congested unit.