Deep South hoisted and set the four sections of the coker derrick structure, the heaviest of which weighed 256 tons, and two 450-ton coke drums at a Midwest Refinery using our 2,500-ton VersaCrane TC-36000 and our 275-ton Demag CC-1400.
Using our powerful 2,500-ton VersaCrane TC-36000 with 450’ main boom and a 260’ radius, Deep South successfully removed and replaced these vessels, the largest of which was 420 tons.