Blue Sea Modular Transport
In South Carolina, Deep South was contracted to transport and secure seven modules from the fabricator shop to a barge site via Scheuerle SPMTs. Using Deep South’s barge ramps, squat cans, squat beams, and over 250 chains, Deep South rolled onto the barge safely and efficiently secured the modules for their blue sea voyage.
Pictured here is the longest module that weighed 640,000 pounds and was 190’ long x 24’ wide. The trailer configuration utilized was a 24-line double-wide Scheuerle SPMT, with spacer decks incorporated to support the integrity of the module.
-
Equipment Used
-
Services Used
-
By the Numbers
- 24-lines Double-wide Scheuerle SPMTs
- Longest Module Weighed 640,000 lbs. and was 190’ long x 24’ wide
Related Projects
Creative Thinking Keeps Transport Costs Low and Delivery Quick
View Project
Creative Thinking Keeps Transport Costs Low and Delivery Quick
As part of a natural gas fractionation project, an EPC contractor needed to transport two large drums to the customer’s facility.
200 Lifts at Michigan Power Plant
View Project
200 Lifts at Michigan Power Plant
At a Michigan power plant, Deep South utilized a 660-ton Demag CC-2800 to complete 200 lifts over an 8 month duration.
Coal Export Facility System Upgrade
View Project
Coal Export Facility System Upgrade
At a coal export terminal in Southeast Texas, Deep South provided multiple single and tandem lifts to install this conveyor system during a facility upgrade.