Blue Sea Modular Transport
In South Carolina, Deep South was contracted to transport and secure seven modules from the fabricator shop to a barge site via Scheuerle SPMTs. Using Deep South’s barge ramps, squat cans, squat beams, and over 250 chains, Deep South rolled onto the barge safely and efficiently secured the modules for their blue sea voyage.
Pictured here is the longest module that weighed 640,000 pounds and was 190’ long x 24’ wide. The trailer configuration utilized was a 24-line double-wide Scheuerle SPMT, with spacer decks incorporated to support the integrity of the module.
-
Equipment Used
-
Services Used
-
By the Numbers
- 24-lines Double-wide Scheuerle SPMTs
- Longest Module Weighed 640,000 lbs. and was 190’ long x 24’ wide
Related Projects
Customized Heavy Lift Solution Safely Delivers Regenerator
View Project
Customized Heavy Lift Solution Safely Delivers Regenerator
Limited space, low ground bearing pressure and a cumbersome heat exchanger combined to create some unique challenges for the Deep South team in California. The customer needed to lift a 35’-diameter x 70’-long regenerator head with cyclones, weighing 775,000 pounds in a tight, geologically compromised area.
Combined Gantry/Strand Jack Systems Power Lifts Co-Gen Train
View Project
Combined Gantry/Strand Jack Systems Power Lifts Co-Gen Train
The construction of a combined-cycle power station in Louisiana required a specialty contractor to move, lift and set a STG generator (692,250 lbs.) and HIP turbine (392,420 lbs.).
Dismantling and Relocating A Petrochemical Facility
View Project
Dismantling and Relocating A Petrochemical Facility
Deep South was contracted to dismantle and relocate 9 vessels from a petrochemical plant using a combination of barging, heavy transport, and heavy lift services.