Blue Sea Modular Transport
In South Carolina, Deep South was contracted to transport and secure seven modules from the fabricator shop to a barge site via Scheuerle SPMTs. Using Deep South’s barge ramps, squat cans, squat beams, and over 250 chains, Deep South rolled onto the barge safely and efficiently secured the modules for their blue sea voyage.
Pictured here is the longest module that weighed 640,000 pounds and was 190’ long x 24’ wide. The trailer configuration utilized was a 24-line double-wide Scheuerle SPMT, with spacer decks incorporated to support the integrity of the module.
-
Equipment Used
-
Services Used
-
By the Numbers
- 24-lines Double-wide Scheuerle SPMTs
- Longest Module Weighed 640,000 lbs. and was 190’ long x 24’ wide
Related Projects
Expert Execution on a Time-Critical LNG Changeout
View Project
Expert Execution on a Time-Critical LNG Changeout
When a critical motor failed at an LNG plant, the clock started immediately. At 680,000 lbs, the motor had never been changed out before.
Precarious Conditions on the Dock
View Project
Precarious Conditions on the Dock
Rail-traveling ship loaders are a familiar sight on the Gulf Coast (and around the world)—and they are essential to the efficient loading of bulk materials. Disruption to the operation of these massive machines directly affects productivity and the bottom line, as represented by one company's experience when wind from a severe storm knocked the machine off its rails, leaving it dangerously close to the edge of the dock.
Facilitating a Refinery Column Placement in Tight Confines
View Project
Facilitating a Refinery Column Placement in Tight Confines
Transporting, placing, and lifting a refinery column — one that is comparable to the height and weight of the Statue of Liberty — is a familiar challenge for heavy lift, heavy haul experts like Deep South. Maneuvering it around existing racks and systems adds another layer of complexity.