Our Demag CC-6800 set 4 vessels into final position, traveling with the full load on the hook and utilizing Deep South’s specialty ramps.
Overcoming Obstacles: 800-mile Turnkey Challenge with Notable Jack and Slide
View Project
Overcoming Obstacles: 800-mile Turnkey Challenge with Notable Jack and Slide
Using its nationwide resources, Deep South transported a reactor and third stage separator from Oklahoma to Ohio and then to its final destination in the refinery using a combination of barging, over-the-road transportation, jack and slide operations, and heavy lifting.
Demag CC-2800 Completes Lock Hopper Changeout
View Project
Demag CC-2800 Completes Lock Hopper Changeout
Overlooking Lake Michigan, Deep South assisted in a steel mill lock hopper changeout using the 660-ton Demag CC-2800 with 138' of main boom and 157' of luffing jib with super lift attachment.