Industrial Airpark Lift
At an industrial airpark in Louisiana, Deep South set steel roof sections weighing 32,000 pounds and measuring 85' long by 30' wide each. Two 265-ton Liebherr LTM 1220-5.1s and a 60-ton Tadano GR-600XL-1 assisted in the build. Custom rigging was designed for the lifts to ensure level alignment.
-
Equipment Used
-
Services Used
-
By the Numbers
- Sections weighed 32,000 pounds
- Measured 85' long x 30' wide
Related Projects
Demag CC-2800 Completes Lock Hopper Changeout
View Project
Demag CC-2800 Completes Lock Hopper Changeout
Overlooking Lake Michigan, Deep South assisted in a steel mill lock hopper changeout using the 660-ton Demag CC-2800 with 138' of main boom and 157' of luffing jib with super lift attachment.
Precision Meets Power
View Project
Precision Meets Power
Replacing a 650-kip reactor head in the Southwest required Deep South’s team to fit a crane into a tight space where others had been unable to do so. The job involved precise execution to build a high-capacity crane over a pipe rack and into a confined space, which called for the assistance of our 800-ton gantry system, 500-ton Liebherr LTM 1400-7.1, and 265-ton Liebherr LTM 1220-5.1.
An Ammonia Advantage
View Project
An Ammonia Advantage
With ease and precision, Deep South moved an almost one-million-pound ammonia converter and a 213,848-pound cartridge onto a barge and across a levee.