Tight Tailswing, Turnkey Solution
In the Southeast, Deep South performed a complex turnkey project that required equipment modification and careful planning.
To begin, Deep South received a reactor from the ship of origin and transported it via barge to a petrochemical facility up river. Using Goldhofer SPMTs, Deep South off-loaded the vessel from the barge and negotiated very tight turns and low pipe racks with minimum clearance to get it to the final off-loading location. Five-hundred-ton gantries were used to off-load to temporary supports.
Deep South modified the 1,500-ton VersaCrane TC-24000 specifically for this project to accommodate a very tight tail swing requirement. The vessel weighed 420,000 pounds, measured 100’ long and was lifted using 200’ of boom at a 95’ radius. Scheuerle SPMTs were used with the tailing frame to tail the load due to space constraints.
-
Equipment Used
-
Services Used
-
By the Numbers
- Vessel Weighed 420,000 Pounds
- Vessel Measured 100’ Long
- VersaCrane was 200’ of Boom at a 95’ Radius
Related Projects
Specialized Transport Solutions Keep Drum Delivery On Track
View Project
Specialized Transport Solutions Keep Drum Delivery On Track
Chemical drums are massive storage systems, both in size and weight, that are used by manufacturers. Transporting them from fabrication to facility requires considerable planning and care. Consider the 151,338-pound chemical drum that was manufactured for a petrochemical company in Texas. The drum measured 36’11” x 18’2” x 20’8” and needed to be moved 50+ miles from North Houston to Baytown along major roads.
Custom Connections Deliver Heavy Systems Safely, Timely, and Cost Effectively
View Project
Custom Connections Deliver Heavy Systems Safely, Timely, and Cost Effectively
Deep South has put its transport and skills to work for a heavy industrial project in the Southwest that required Deep South to direct discharge from ships gear to barge, haul and sett a cold box, depropanizer and six modules.
Flare Stack Lift
View Project
Flare Stack Lift
Deep South Crane and Rigging was contracted for a heavy lift project in Norco, Louisiana. The scope of work required for this lift included lifting two sections of a flare stack and the flare tip.