250T Offshore Ship Lift in the Southwest
Using a Terex Demag CC-2800, Deep South moved this offshore ship’s crane pieces into place. Pictured here: With rigging included, the total lift weight was 250T.
-
Equipment Used
-
Services Used
-
By the Numbers
- 250T lift total weight
Related Projects
Cantilever Bar Approach Helps Ease Exchangers Into Place
View Project
Cantilever Bar Approach Helps Ease Exchangers Into Place
Deep South used a cantilever beam (also commonly referred to as a cantilever bar), which incorporates a compact counterweight design with customizable rigging attachment points, to move eight 118,000-pound exchangers into position under an existing steel structure at a refinery optimization project in the Southwest.
Dismantling and Relocating A Petrochemical Facility
View Project
Dismantling and Relocating A Petrochemical Facility
Deep South was contracted to dismantle and relocate 9 vessels from a petrochemical plant using a combination of barging, heavy transport, and heavy lift services.
Overcoming Poor Weather Conditions in Michigan to Lift 12 Components
View Project
Overcoming Poor Weather Conditions in Michigan to Lift 12 Components
Deep South set the first of 12 components ranging from 85,000 pounds to 110,000 pounds using the 1,400-ton Demag CC-6800 at a mining facility in Michigan.