The upper and lower sections of this vessel, weighing 85T and 102T, respectively, were transported from the port to the refinery using over-the-road Dual Lane Goldhofers. They were then lifted and set, in combination with their supporting structures, using the 660-ton Demag CC2800-1 and the 500-ton Liebherr LTM1400 7.1.
-
Equipment Used
-
Services Used
-
By the Numbers
- Weighed 85T and 102T
Related Projects
Power Move: Transformer Lift and Staging Rises to the Occasion
View Project
Power Move: Transformer Lift and Staging Rises to the Occasion
In support of a power plant project in the Northeast, Deep South crews were tasked with transporting and staging four transformers, each 22’ high, 12’ wide and 14’ long and weighing 314,000 pounds.
Cantilever Bar Approach Helps Ease Exchangers Into Place
View Project
Cantilever Bar Approach Helps Ease Exchangers Into Place
Deep South used a cantilever beam (also commonly referred to as a cantilever bar), which incorporates a compact counterweight design with customizable rigging attachment points, to move eight 118,000-pound exchangers into position under an existing steel structure at a refinery optimization project in the Southwest.
A One Lift Truss and Tower Take-Down
View Project
A One Lift Truss and Tower Take-Down
In the Southwest, a 100' diameter wood pellet bin caught fire and collapsed, compromising the 117,000-pound, 215’ long truss and tower conveyor system.