Norco Flare Stack Lift
Deep South Crane and Rigging was contracted for a heavy lift project in Norco, Louisiana. The scope of work required for this lift included lifting two sections of a flare stack and the flare tip. To perform these three lifts totaling nearly 300’, Deep South used the 1,320-ton Demag AC-1000 and the 500-ton Liebherr LTM 1400-71, which served as the tail crane.
The first section of the flare stack weighed 239,000 pounds and measured 135’ long. The second section weighed 114,000 pounds and measured 150’ long. The third and final lift of the flare tip weighed 15,000 pounds and measured 12’ long.
One of the key challenges involved in this lift was providing cranes that were both capable of performing these lifts and could be set up with very little space while negotiating a single entrance and exit point. The 1,320 Demag AC-1000 and the 500-ton Liebherr LTM 1400-71 tail crane were able to meet these demands while safely and successfully completing the lifts.
Equipment Used
Services Used
By the Numbers
- First Section of Flare Stack: 239,000 lbs., 135' long
- Second Section of Flare Stack: 114,000 lbs., 150' long
- Flare Tip: 15,000 lbs., 12' long
Related Projects
Multi-Module Mission
View Project
Multi-Module Mission
The heavy haul transport of oil and gas refinery components is always a challenge. Transporting 17 modules, all in the span of two weeks, raised the bar. The modules varied greatly in size and weight. Two of the modules exceeded 260,000 lbs., while 11 were more than 16’ high, three were more than 19’ high, and 13 had widths greater than 18’. Initially, the customer had trouble finding a company to move the modules to their site in Texas.
A Technical Towering Roll, Move, and Lift
View Project
A Technical Towering Roll, Move, and Lift
As part of a complex project for a refinery, the Deep South team was tasked with receiving, transporting and lifting a 114’-7” x 33’-5” x 39’-10” vacuum tower weighing in excess of one million pounds. This multi-step project required considerable planning, technology and creative thinking.
Southeast Petrochemical Turnaround
View Project
Southeast Petrochemical Turnaround
Supplying all cranes in two units during a petrochemical turnaround in the Southeast, Deep South supported the change out of old components and reinstallation of new components with 19 cranes working throughout the project.