Blue Sea Modular Transport
In South Carolina, Deep South was contracted to transport and secure seven modules from the fabricator shop to a barge site via Scheuerle SPMTs. Using Deep South’s barge ramps, squat cans, squat beams, and over 250 chains, Deep South rolled onto the barge safely and efficiently secured the modules for their blue sea voyage.
Pictured here is the longest module that weighed 640,000 pounds and was 190’ long x 24’ wide. The trailer configuration utilized was a 24-line double-wide Scheuerle SPMT, with spacer decks incorporated to support the integrity of the module.
-
Equipment Used
-
Services Used
-
By the Numbers
- 24-lines Double-wide Scheuerle SPMTs
- Longest Module Weighed 640,000 lbs. and was 190’ long x 24’ wide
Related Projects
Bridge Span Move and Lift Set Pace for New Bridge Completion
View Project
Bridge Span Move and Lift Set Pace for New Bridge Completion
In support of a major bridge construction project in the Midwest, Deep South crews helped transport and install four bridge spans from an off-site staging area to the bridge foundation.
Specialty Ramps Save Client Money
View Project
Specialty Ramps Save Client Money
Our Demag CC-6800 set 4 vessels into final position, traveling with the full load on the hook and utilizing Deep South’s specialty ramps.
Overcoming Poor Weather Conditions in Michigan to Lift 12 Components
View Project
Overcoming Poor Weather Conditions in Michigan to Lift 12 Components
Deep South set the first of 12 components ranging from 85,000 pounds to 110,000 pounds using the 1,400-ton Demag CC-6800 at a mining facility in Michigan.