Using 92 lines of Deep South's heavy haul Scheuerle SPMTs with 3 power pack units, Deep South successfully assisted the client in moving this offshore platform in Texas. The offshore platform weighed approximately 1,990 tons and spanned 83’ long, 73’ wide, and 95’ tall.
-
Equipment Used
-
Services Used
-
By the Numbers
- Platform weighed 1,990T
- Measured 83' long x 73' wide x 95' tall
- Used 92 lines of SPMTs
Related Projects
Dismantling and Relocating A Petrochemical Facility
View Project
Dismantling and Relocating A Petrochemical Facility
Deep South was contracted to dismantle and relocate 9 vessels from a petrochemical plant using a combination of barging, heavy transport, and heavy lift services.
400,400 Pound Boiler Lifts
View Project
400,400 Pound Boiler Lifts
Three boilers were delivered horizontally to Deep South’s 500-ton hydraulic gantry system and then trans-loaded onto Scheuerle SPMTs in a very congested unit.
Mitigating the Mississippi
View Project
Mitigating the Mississippi
Pulling from its resources and years of experience, Deep South designed and fabricated a barge ramp in 2 weeks time meeting the new CORPS requirements and allowing the project to continue on schedule.